MT11020 texture was requested across the relevant surfaces.
Complex molded prototypes. Without losing the design intent.
An electric-mobility hardware team needed a textured polycarbonate control housing shaped around its design and assembly requirements.
Snapfab worked with the engineer to make the tooling tradeoffs clear and agree on a prototype approach before the build moved forward.

A useful prototype had to reflect more than the outer shape.
The housing's finish, low-draft areas, threaded hardware, and mating relationship all needed consideration. Each decision could affect another.
Low-draft areas were part of the DFM discussion, alongside draft approved on other specified features.
Two threaded inserts were specified: one M2 and one M1.6.
The housing was intended to mate with a lid produced in a separate, preceding project.
Make the tradeoffs clear.
Requirements first. Then a tooling route the team could evaluate and approve.
Review the interacting requirements
DFM discussion covered exterior texture, low-draft areas, molded-in hardware, and a mating interface. The engineer asked whether movable tooling inserts could retain a low-draft area, while approving draft on other specified features.
Compare the tooling tradeoff
Snapfab proposed extending hand-loaded tooling-insert coverage to support the requested texture. The hand-loaded inserts are elements of the mold, distinct from the threaded inserts molded into the component.
Let the engineer choose
The team presented two clear finish and parting-line paths. The customer selected the MT11020 texture with additional parting lines.
MT11020 texture
Additional parting lines to support the requested texture.
Potential mismatch of 0.1 mm was discussed as an anticipated tradeoff, not a measured result.C2 finish
Alternative finish without that parting-line change.
From approved direction to shipment.
Approximately 10 calendar days from DFM approval to shipment on this housing build.
The customer selected the texture and parting-line approach.
Progress updates followed through tooling and mold fitting.
The team reported molding completion, followed by QC.
Shipment was dispatched approximately 10 calendar days after DFM approval.

Design intent. Now in hand.
Surface texture, reinforcing ribs, mounting features, and insert locations come together in a physical prototype. A practical next step for evaluating the housing beyond CAD and planning the next build.
A molded prototype, with decisions made together.
Snapfab reported successful molding, QC completion, and shipment approximately ten calendar days after DFM approval. After receipt, the customer shared positive feedback about appearance.